# Refined Calendar A

[Open the refined staging calendar](https://calendar-stage-20260923.cfd-staging.com/panel/?calendar=refined#calendar)

**PASS.** Existing entries open the lead’s full data in the shared sidebar. Empty cells and plus buttons open a fresh quick-entry form in that same sidebar. The selected day is highlighted yellow. Quick fields include date, contact search, reminder/work choice, duration, weekends, calculated finish, save and cancel. Switching to another empty day clears the selected contact and quick values. Work and reminder remain independent.

The original A/B routes remain available. This is a separate refinement requested after the original 22 calendar and 25 proposal criteria passed. Their detailed revision-7 evidence remains unchanged below the addendum.

## Verification

- Independent code review passed. Local browser scenarios cover original A/B and the new flow, including empty-cell/plus clicks, existing-entry clicks, reset, note-draft retention, failed saves and conflict recovery.
- The repository suite passes 43 Node tests, five Worker tests and one Python test.
- Deployed work and reminder saves passed on the existing synthetic Demo Anna fixture. Its exact previous scheduling fields were restored afterward. The quick form did not overwrite notes.
- Independent Luna xhigh desktop and mobile reviews inspected fresh screenshots of the actual deployed refined route. Header, calendar, quick controls, existing-lead sections and footer were covered. No material visual defects remain.
- Served calendar assets match the committed hashes. Proposal and backend source are unchanged. Both staging outboxes were empty at provider readback. No production changes or client sends.

## Inspect the changed states

### Desktop

- [Quick work inputs](qa/desktop/03-work-controls-top.png)
- [Work summary and save](qa/desktop/04-work-controls-bottom.png)
- [Existing lead details](qa/desktop/06-existing-lead-top.png)
- [Existing lead notes](qa/desktop/07-existing-lead-notes.png)
- [Existing lead dates](qa/desktop/08-existing-lead-dates.png)
- [Existing lead footer](qa/desktop/09-existing-lead-bottom.png)

### Mobile

- [Quick work inputs](qa/mobile/03-work-controls-top.png)
- [Work summary and save](qa/mobile/04-work-controls-bottom.png)
- [Existing lead details](qa/mobile/06-existing-lead-top.png)
- [Existing lead notes](qa/mobile/07-existing-lead-notes.png)
- [Existing lead dates](qa/mobile/08-existing-lead-dates.png)
- [Existing lead footer](qa/mobile/09-existing-lead-bottom.png)

## Source and recovery

Application source: `435a19cb3a1d49c921d163290ba86719ed90c18a` on `codex/calendar-contract-20260927`.

A Worker: `fce89411-3d72-4625-9e2d-ad93351a7866`. Narrow A rollback: `3efe3760-cd64-4d1e-86a0-bfce234a73a9`. No migration was needed. Original B was not deployed by this refinement. A separate portal/proposal task is preparing a new contract. Its local header CSS draft was not deployed.

[Deployment receipt](deployment.json) · [Local verification](local-verification.json) · [Live save verification](live-save.json) · [Provider readback](provider-readback.json) · [Review models](review-models.json) · [Mobile observation reconciliation](mobile-reconciliation.json) · [Desktop intent reconciliation](desktop-reconciliation.json) · [Final QA acceptance](qa-acceptance.json)
